Featured Project — Blue Lake Dairy

PRODUCTIVITY & AUTOMATION UPGRADE

Rather than replacing the existing production line, SEQUENTIS identified a key manual bottleneck within the packaging process and delivered a targeted automation upgrade.

Client Challenge

A manual lid-handling step in the packaging process limited throughput and added labour and inconsistency. The client wanted to lift packaging performance without the cost and disruption of replacing the existing line.

SEQUENTIS Solution

By integrating an automatic lid feeding and lid pressing solution into the existing line, SEQUENTIS removed the manual bottleneck — improving packaging efficiency, reducing manual intervention, and enhancing overall production reliability while maximising the value of the customer’s existing equipment.

PROJECT SCOPE

  • Packaging line assessment
  • Bottleneck analysis
  • Automation integration
  • Lid handling optimisation
  • Commissioning support

BUSINESS BENEFITS

  • Reduced labour dependency
  • Increased production efficiency
  • Improved line consistency
  • Lower operating costs
  • Extended life of existing production assets
Visual Showcase